Showing posts with label 3D. Show all posts
Showing posts with label 3D. Show all posts

Tuesday, June 24, 2014

Combining Image Capture with Monitoring

I'd been looking around for an article on the relationship between image capture and more conventional
Hi Tech on Australia's oldest bridge
measurement and instrumentation.

In SCADA systems there have been instances I recall where image capture can be triggered by door movement for security purposes.  The door opens, the person or animal coming in [yes Kangaroos can open doors] triggers an image capture - where the image captured is then uploaded to the central control room.

Friday, January 27, 2012

On Graphics and Indication in Unit Control

Fundamentally an operator interacts with an equipment based automation control system by means of a touch panel, push-buttons, panel alarms, lights, hooters and at least one key graphic display.

Today I am in the Worthing, UK, home of Invensys Eurotherm and had an opportunity to talk with some of the Senior Engineers and think about the life of an plant operator and the use of these devices. As a result I decided to focus this post on three aspects:-

  • Hands-Free Indication
  • Primary Panel Graphics
  • State of Play Indication
All three aspects need to be taken into consideration in the implementation of packaged control solutions.


Popular Posts